Education

Brighton College Sports & Science Centre

Works

SEC's package includes the design development, manufacture, finished joinery products and installation of which included:

Internal fire rated primed and veneered door sets and associated ironmongery for the proposed college. Bespoke joinery included the internally bespoke pre-finished/fire rated wall panelling, the externally pre-finished external timber decking to the courtyard and balcony areas, to the highest standards with regards detailing quality and finishing uniquely designed for the Client.

Client

McLaren Construction Ltd

Architect

OMA Architects

Description

Designed by award-winning Dutch Architect; OMA, the project comprises of the demolition of existing buildings within the site boundary and the construction of a new Sports and Science Building over four floors. The new building includes a swimming pool in the basement along with underground parking for the college fleet of minibuses. The ground floor has a cafe, sports viewing area, gymnasium and sports hall as well as an indoor sprint running track. The upper floor holds laboratories for all core sciences such as Chemistry, Physics and Biology and the rooftop amenity space will feature a running track.

  • Project Manager
    David Lambeth
  • Contracts Manager
    Steve Ost
  • Site Manager
    Peter Lambeth